Definitions
- Precondition - Business rules that must be evaluated and can result in
TRUE
orFALSE
. - Applicable - All preconditions are met, the status is set to
open
and the task is available to be performed. - Automated - Can only be performed by a system.
- Manually - Can only be performed through human interaction.
- ProcessDAO - Blueriq process database which contains the current process state of an application.
- TASKS table - A table in the process database with the current state of all tasks for all process instances.
application.properties
- A text file with server properties used by a Blueriq application.- Runtime - An application that is executing Blueriq models.
- Process - A process instance on the runtime.
- Case stage - A stage in the reference process for a business function. Typically a process model of type phase which has a milestone as precondition and its own milestone as postcondition.
Process init
When a process is triggered by a message event, a process instance is made. The init state of the process instance is decided by 2 components:
- The line that flows out of the message event. The first node the process flows to will get the status
open
. If this is a task, then this task will be required andopen
and gets an entry in the TASKS table. - The data in the message event will be used to decide what ad hoc nodes are applicable. All applicable ad hoc nodes will get an entry in the TASKS table.
Open
A task gets the status open
when the task is applicable within a process. This means that the task has met its precondition. A precondition can be a business rule or a trigger. A business rule is logic that is evaluated by Blueriq and can be mapped to the process engine to give the precondition a value. A trigger can be another task or an event like a timer or a message.
When a task is applicable, then it will get an entry in the TASKS table of in the processDAO. The start date is the date the task is applicable, and the initial status will be set to open
. Such open
tasks will be shown in a worklist and can be executed if the user has permission to start the task.
When an automated task is applicable then it will start automatically. So an automated task will not be shown in a work list and changes status from open
automatically to started
.
When an open
task is required then it MUST
be performed before exiting the process. When an open
task is not required but is applicable than the task MAY
be performed.
When an ad hoc task is not applicable anymore and is not required it will be canceled
and is not available on the worklist.
At the moment when an ad hoc task is applicable and required then it has to be performed. Even when the precondition changes back to FALSE
. The task stays on the work list because it is required and MUST
be performed.
Current behavior - Blueriq 9.7
Precondition | Required | |
---|---|---|
MAY be performed | TRUE | FALSE |
MUST be performed | TRUE | TRUE |
Not relevant | FALSE | TRUE |
Not relevant | FALSE | FALSE |
MUST be performed | TRUE -> FALSE | TRUE |
There is an improvement that will change this behavior, namely that the precondition overrules the required value. When the improvement is implemented the next table can be used as reference:
Precondition | Required | |
---|---|---|
MAY be performed | TRUE | FALSE |
MUST be performed | TRUE | TRUE |
Not relevant | FALSE | TRUE |
Not relevant | FALSE | FALSE |
Not relevant | TRUE -> FALSE | TRUE |
Be careful when modeling a dynamic process with required ad hoc tasks in combination with repeatable is set to TRUE
. The process will only continue when the precondition of the task is evaluated to FALSE
after completing the task. If the precondition stays TRUE
then the repeatable setting will kick in and in combination with the required setting the task MUST
be performed again. Required can be conditional, so there are multiple scenarios how to handle this.
Started
A task gets the status started
when someone or a system starts to execute the task. A precondition to start a task is that the task must be open
and thus applicable. The task will keep the status started
during the entire time it is performed.
Manual tasks
When a task is started manually and cannot be finished due to an error it will do a roll back. This means that there is no transaction to the database and the task status will be set back to open
. So a manual task that receives an error can be executed again via the worklist.
When a manual task is started it is also locked for other users. When started
the task is not available in the worklist.
Automated tasks
When an automated started task gets an error it will stay in the status started
. There will not be a transaction to the database, but the task cannot be triggered again without intervention. The reason an automated task does not get the status open
is to prevent an infinite loop. First the cause of the error needs to be fixed before the task can be set back to open
. Setting an automated task back to open
can be done by the run time API. Once the automated task is set from started
to open
it will trigger itself on the next tick of the portal timer. The portal timer is a server setting in a server property.
Cancelling tasks
It is possible to cancel a started
task, which will set a task back to open
.
When the implementation has a cancel event and this event is used for example by pressing a cancel button the task does a roll back and gets the status open
. The task is available on the worklist.
Sometimes it is needed to intervene and cancel a task. For example when someone closes his browser. Opening the browser again will open the dashboard, but will not show the task in the worklist, because the task still has the status started
. There are 3 ways to cancel started
tasks and set it back to open
.
- Use the server setting
blueriq.processengine.cancel-started-tasks=true
. This will cancel all tasks when...:
- ... the Runtime starts and an application is used for the first time
- ... in development, the reload project/projects/branch/settings buttons are clicked
- ... a new version of the application is published using the publisher
- Reloading the project in the developer dashboard.
- Use the run time API to change a task status from
started
to
. Information about the run time API can be found here.open
An automated task will trigger itself when the status is set back to open
.
A manual task will be available again in the worklist.
Completed
A task gets the status completed
when a task is successfully performed. The task is not part of work lists any more. If the task is repeatable, then after completing the task a new entry will be created in the TASKS
table with the status open
and thus part of the worklist. The finished task has the status
.completed
A completed
task cannot be performed again if it is not repeatable. So make sure that all information is available after finishing the task.
Canceled
A task gets the status canceled
when it is not relevant any more. For example, there exists a non-required ad-hoc task with status open
. There is enough data within the case to finish the sub-process, then all open
tasks in the sub-process are canceled because they are not relevant any longer. A required task cannot be canceled and should always be performed unless it is not applicable any more (not implemented yet!).
Expired
A task gets the status expired
when its timer exit evaluates TRUE
.
There is a property that sets the Timer interval on a server. This property can be set in the Settings/Timer on the developer dashboard or in the application.properties
file. At every interval all relevant timer nodes will be evaluated. When a timer exit is evaluated TRUE
then the timer exit event will be flowed (the process engine will follow the line from the timer exit event). The task gets the status expired
and is not available on the work list and thus cannot be performed any more.
Be careful with timeout dates in dynamic processes, because when a task timed out the taken action cannot be undone. You must take into consideration the level of empowerment you give the system in telling a user he or she cannot perform certain actions anymore. It is better to use due dates on events and let an event notify a user, or add new information to the case so that new decisions can be made which can steer the process to a different direction if needed.
There are patterns for time management in a dynamic process which do not use the expire date.
Process Ends
All not required tasks will get the status canceled
. Required tasks must be performed before the process can end.
Schematic overview
Fail-safe scenarios
This page has a few scenarios that describe behavior of the process engine in dynamic process handling with failures and how to fix the failures.