You are viewing the documentation for Blueriq 17. Documentation for other versions is available in our documentation directory.
Identifier |
Component |
Issue |
Solution |
---|---|---|---|
BQ-22611 |
|
In Blueriq 16.9 the date/time handling was performance optimized. As an unexpected side effect, the handling of historical dates (before the Gregorian calendar was in existence) could be incorrect because Julian and Gregorian date handling was sometimes mixed up |
Starting in Blueriq 17.0, historic dates (before 15-10-1582 Gregorian) are interpreted and formatted using the (proleptic) Gregorian calendar rules instead of the Julian calendar rules. |
Overview
Content Tools