EnhancementsEnhancement | Details |
---|
Version and release notes added to project structure in | Blueriq Encore | The version and release notes of internal and external libraries can now be viewed and edited from the detail panel in the project structure view. | Improved readability of expressions in | Blueriq Encore | Min and max size of expression fields have been optimized troughout Blueriq Encore in to reduce the need to open the expression editor popout. | Automated project configuration in | Blueriq Encore | Newly created Configuration- and process modules are now automatically included in the project configuration. | Optimized layout of conditional value lists in | Blueriq Encore | The horizontal scrollbar that appears for large conditional value lists will now remain visible. | Optimized read only mode in Encore | Expressions, flows, and process in read only mode (e.g. because its defined in an external library) are now visible as such. | Increased max width of secondary navigation panel in Encore | The width of the secondary navigation panel, which displays the lists of elements, can now be increased more without conflicting with the propreties panel. | Project and dashboard exports encrypted by default | When exporting a project or dashboard from Blueriq Encore, the 'Encrypt' option is now checked by default. | Duplicate containment in Encore | You can now duplicate items in a page or container in Blueriq Encore. | Improved validation of inference rule expressions in Encore | Expressions that are evaluated as part of an inference rule, including default expressions and rule group conditions, are now validated to only refer to singletons or the rule's related entity. All usages of other multitons are now reported as error directly within the expression editor, ahead of project initialization in the runtime. |
DocumentationDocumentation on the new features and improvements of this release is linked in the respective topics. Our Platform support is updated. Changes are: Upgrade InstructionsUpgrade InstructionsSee Release 17.3 Upgrade Instructions for the There are no specific upgrade instructions for this release. UI Text Box |
---|
type | Tip |
---|
As a best practice - backup your repository
- backup your database before running scripts
- backup your directory ([Blueriq installation directory]\Runtime)
- backup any config files you have altered under [Blueriq installation directory]\Services
before you start the upgrade. |
Artifacts The The Blueriq artifacts are available under name: 17.x3.x0.xxxx81 This release includes these versions of Blueriq components with a separate life cycle: Component | Version |
---|
Customer Data Service | 45.20.x3 | DCM Lists Service | 34.0.x2 | Material Theme | 1.13.x4 | Development tools frontend | 12.50.x1 | DCM Maintenance App | 35.0.x4 | Audit Consumer | 1.0.2.x3 | DCM Dashboard Service | 2.0.2.x | Gateway Service | 1.0.1.x3 | Document Renderer | 2.12.x0 |
Blueriq LibrariesThere are no specific Library updates for this release. LibrariesIn this release, the set of third party libraries that is used by Blueriq was updated. When your installation of Blueriq includes custom components (artifacts that do not ship with Blueriq, such as proprietary plugins), those components should be tested for compatibility with these changes. UI Expand |
---|
|